Garden Layout Slide

The start of a block installation by definingthe contour of the firstrow of blocks

The contour line forthe first row ofblocks is excavatedready for foundationmaterial

The first row ofblocks laid out along thefoundation contour

Other rows of blocks areplaced to give someterraced height to theinstallation
